ITAC Assessment: DS0016
ITAC logo
ITAC Assessment: DS0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Skidsteer Loaders
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 170
Plant Area 110,000
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 5,252
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,118 2,171,161
kWh
Natural Gas $53,272 9,616
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,841 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,293

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,400 $33,940 $11,400
312,427
kWh
-
02 2.7135: Install occupancy sensors $72 $182 $72
2,052
kWh
-
03 2.4133: Use most efficient type of electric motors $1,155 $1,873 $1,155
31,653
kWh
-
04 2.7491: Insulate glazing, walls, ceilings, and roofs $2,389 $16,960 - $2,389
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $161 $150 - $161
-
MMBtu
06 2.4322: Use or replace with energy efficient substitutes $2,371 $20,000 $2,371
65,064
kWh
-
07 2.7313: Recycle air for heating, ventilation and air conditioning $12,293 $38,640 $(-2,209.0)
(-60,668)
kWh
$14,502
-
MMBtu
TOTAL RECOMMENDED $29,841 $111,745 $12,789
350,528
kWh
$17,052
-
MMBtu
TOTAL IMPLEMENTED $12,293 $38,640 $(-2,209.0)
(-60,668)
kWh
$14,502
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs