Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Ball and Roller Bearings
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 200,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,129,879 23,817,186
kWh
Electricity Demand $154,676 45,515
kW-mo/yr
Electricity Fees $76,826 -
Natural Gas $60,593 15,304
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $158,131 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.4323: Use optimum size and capacity equipment $78,182 $160,000 n/a $70,121
1,479,352
kWh
$8,061
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $14,963 $2,000 $13,404
282,772
kWh
$1,559
-
kW-mo/yr
- - -
03 2.7231: Use radiant heater for spot heating $14,509 $12,000 - - $14,509
-
MMBtu
- -
04 2.4133: Use most efficient type of electric motors $13,903 $15,470 n/a $12,799
270,029
kWh
$1,104
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,417 $4,200 $8,446
178,144
kWh
$971
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,164 $5,040 $5,626
118,682
kWh
$647
-
kW-mo/yr
- - $(-109.0)
07 2.7135: Install occupancy sensors $3,232 $1,875 $2,863
60,396
kWh
$369
-
kW-mo/yr
- - -
08 2.4239: Eliminate or reduce compressed air usage $2,848 $4,000 $2,564
54,105
kWh
$284
-
kW-mo/yr
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $622 $593 $316
6,656
kWh
$31
-
kW-mo/yr
- - $275
10 3.3131: Use evaporation to concentrate material $11,487 $27,000 - - - $11,487
-
Tgal
-
11 3.4154: Eliminate leaks in water lines and valves $2,804 $500 - - - $2,804
-
Tgal
-
TOTAL RECOMMENDED $158,131 $232,678 $116,139
2,450,136
kWh
$13,026
-
kW-mo/yr
$14,509
-
MMBtu
$14,291
-
Tgal
$166
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs