ITAC Assessment: DS0014
ITAC logo
ITAC Assessment: DS0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Filled pasta and pot pies
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 72,164
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 5,564
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,151 2,216,002
kWh
Natural Gas $51,031 10,439
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,198 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,218

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,856 $14,991 $20,856
324,736
kWh
-
02 2.7135: Install occupancy sensors $2,822 $11,013 $2,822
35,756
kWh
-
03 2.4133: Use most efficient type of electric motors $3,370 $4,329 $3,370
52,462
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $301 $168 $301
4,689
kWh
-
05 2.2437: Recover waste heat from equipment $2,980 $4,080 - $2,980
-
MMBtu
06 2.2511: Insulate bare equipment $10,869 $2,424 $10,869
169,402
kWh
-
TOTAL RECOMMENDED $41,198 $37,005 $38,218
587,045
kWh
$2,980
-
MMBtu
TOTAL IMPLEMENTED $38,218 $32,925 $38,218
587,045
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs