ITAC Assessment: DS0002
ITAC logo
ITAC Assessment: DS0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Valve Grinders
NAICS
n/a
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area 33,200
ft2
Annual Production 41,350
pieces
Production Hrs. Annual 2,340
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,610 217,468
kWh
Natural Gas $10,310 2,699
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,929 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,387 $5,687 $1,387
21,102
kWh
-
02 2.2511: Insulate bare equipment $731 $130 $731
7,620
kWh
-
03 2.2515: Use optimum thickness insulation $462 $1,320 - $462
-
MMBtu
04 2.4133: Use most efficient type of electric motors $234 $1,205 $234
3,517
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $123 $96 $123
1,758
kWh
-
06 2.7231: Use radiant heater for spot heating $1,992 $7,200 - $1,992
-
MMBtu
TOTAL RECOMMENDED $4,929 $15,638 $2,475
33,997
kWh
$2,454
-
MMBtu
TOTAL IMPLEMENTED $4,929 $15,638 $2,475
33,997
kWh
$2,454
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs