Assessment Year | 2025 |
---|---|
Principal Product | Asphalt |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $5 M to 10M |
# of Employees | 30 |
Plant Area |
250,000
ft2
|
Annual Production | 138,823
ton
|
Production Hrs. Annual | 1,666
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,999 | 761,451 |
kWh
|
$0.13 |
Electricity Demand | $16,408 | 4,102 |
kW-mo/yr
|
$4.00 |
Electricity Fees | $1,200 | - |
|
- |
Natural Gas | $254,120 | 42,925 |
MMBtu
|
$5.92 |
Other Gas | $2,200 | 1 |
MMBtu
|
$2,200.00 |
TOTAL YEARLY COSTS | $375,927 | |||
RECOMMENDED SAVINGS* | $93,567 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $3,043 | $7,700 | - |
$3,043
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,648 | $1,000 |
$2,648
16,975
kWh
|
- | |
03 | 2.4226: Use / purchase optimum sized compressor | $13,045 | $23,000 |
$13,045
83,622
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,051 | $24,000 |
$12,051
77,250
kWh
|
- | |
05 | 2.4322: Use or replace with energy efficient substitutes | $3,320 | $10,000 |
$3,320
21,280
kWh
|
- | |
06 | 2.1221: Replace obsolete burners with more efficient ones | $9,146 | $90,000 | - |
$9,146
-
MMBtu
|
|
07 | 4.512: Condense operation into one building | $50,314 | $1,800,000 | - |
$50,314
-
MMBtu
|
|
TOTAL RECOMMENDED | $93,567 | $1,955,700 |
$31,064
199,127
kWh
|
$62,503
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs