| Assessment Year | 2025 |
|---|---|
| Principal Product | Asphalt |
| NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | $5 M to 10M |
| # of Employees | 30 |
| Plant Area |
250,000
ft2
|
| Annual Production | 138,823
ton
|
| Production Hrs. Annual | 1,666
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $101,999 | 761,451 |
kWh
|
$0.13 |
| Electricity Demand | $16,408 | 4,102 |
kW-mo/yr
|
$4.00 |
| Electricity Fees | $1,200 | - |
|
- |
| Natural Gas | $254,120 | 42,925 |
MMBtu
|
$5.92 |
| Other Gas | $2,200 | 1 |
MMBtu
|
$2,200.00 |
| TOTAL YEARLY COSTS | $375,927 | |||
| RECOMMENDED SAVINGS* | $93,567 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $3,043 | $7,700 | - |
$3,043
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,648 | $1,000 |
$2,648
16,975
kWh
|
- | |
| 03 | 2.4226: Use / purchase optimum sized compressor | $13,045 | $23,000 |
$13,045
83,622
kWh
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,051 | $24,000 |
$12,051
77,250
kWh
|
- | |
| 05 | 2.4322: Use or replace with energy efficient substitutes | $3,320 | $10,000 |
$3,320
21,280
kWh
|
- | |
| 06 | 2.1221: Replace obsolete burners with more efficient ones | $9,146 | $90,000 | - |
$9,146
-
MMBtu
|
|
| 07 | 4.512: Condense operation into one building | $50,314 | $180,000 | - |
$50,314
-
MMBtu
|
|
| TOTAL RECOMMENDED | $93,567 | $335,700 |
$31,064
199,127
kWh
|
$62,503
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs