ITAC Assessment: DL0263
ITAC logo
ITAC Assessment: DL0263
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 250,000
ft2
Annual Production 138,823
ton
Production Hrs. Annual 1,666
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,999 761,451
kWh
Electricity Demand $16,408 4,102
kW-mo/yr
Electricity Fees $1,200 -
Natural Gas $254,120 42,925
MMBtu
Other Gas $2,200 1
MMBtu
TOTAL YEARLY COSTS $375,927
RECOMMENDED SAVINGS* $93,567 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $3,043 $7,700 - $3,043
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,648 $1,000 $2,648
16,975
kWh
-
03 2.4226: Use / purchase optimum sized compressor $13,045 $23,000 $13,045
83,622
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,051 $24,000 $12,051
77,250
kWh
-
05 2.4322: Use or replace with energy efficient substitutes $3,320 $10,000 $3,320
21,280
kWh
-
06 2.1221: Replace obsolete burners with more efficient ones $9,146 $90,000 - $9,146
-
MMBtu
07 4.512: Condense operation into one building $50,314 $1,800,000 - $50,314
-
MMBtu
TOTAL RECOMMENDED $93,567 $1,955,700 $31,064
199,127
kWh
$62,503
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs