Assessment Year | 2025 |
---|---|
Principal Product | Asphalt |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $5 M to 10M |
# of Employees | 30 |
Plant Area |
60,000
ft2
|
Annual Production | 271,413
ton
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,970 | 836,035 |
kWh
|
$0.081 |
Electricity Demand | $21,972 | 5,493 |
kW-mo/yr
|
$4.00 |
Electricity Fees | $1,200 | - |
|
- |
Natural Gas | $338,402 | 72,266 |
MMBtu
|
$4.68 |
Other Energy | $6,000 | 1 |
MMBtu
|
$6,000.00 |
TOTAL YEARLY COSTS | $435,544 | |||
RECOMMENDED SAVINGS* | $108,705 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $5,103 | - |
$5,103
47,205
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,778 | $2,500 |
$2,778
25,725
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,996 | $36,000 |
$13,996
129,595
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,664 | $10,000 |
$3,664
33,927
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,575 | $7,100 |
$1,575
14,586
kWh
|
- | |
06 | 2.4322: Use or replace with energy efficient substitutes | $2,445 | $10,000 |
$2,445
22,634
kWh
|
- | |
07 | 2.1221: Replace obsolete burners with more efficient ones | $12,178 | $30,000 | - |
$12,178
-
MMBtu
|
|
08 | 4.512: Condense operation into one building | $66,966 | $120,000 | - |
$66,966
-
MMBtu
|
|
TOTAL RECOMMENDED | $108,705 | $215,600 |
$29,561
273,672
kWh
|
$79,144
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs