ITAC Assessment: DL0262
ITAC logo
ITAC Assessment: DL0262
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 60,000
ft2
Annual Production 271,413
ton
Production Hrs. Annual 2,500
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,970 836,035
kWh
Electricity Demand $21,972 5,493
kW-mo/yr
Electricity Fees $1,200 -
Natural Gas $338,402 72,266
MMBtu
Other Energy $6,000 1
MMBtu
TOTAL YEARLY COSTS $435,544
RECOMMENDED SAVINGS* $108,705 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $5,103 - $5,103
47,205
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,778 $2,500 $2,778
25,725
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,996 $36,000 $13,996
129,595
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,664 $10,000 $3,664
33,927
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,575 $7,100 $1,575
14,586
kWh
-
06 2.4322: Use or replace with energy efficient substitutes $2,445 $10,000 $2,445
22,634
kWh
-
07 2.1221: Replace obsolete burners with more efficient ones $12,178 $30,000 - $12,178
-
MMBtu
08 4.512: Condense operation into one building $66,966 $120,000 - $66,966
-
MMBtu
TOTAL RECOMMENDED $108,705 $215,600 $29,561
273,672
kWh
$79,144
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs