ITAC Assessment: DL0253
ITAC logo
ITAC Assessment: DL0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 50,000
ft2
Annual Production 153,000
ton
Production Hrs. Annual 1,188
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,313 1,320,659
kWh
Electricity Demand $61,920 6,796
kW-mo/yr
Electricity Fees $711 -
Natural Gas $237,494 49,001
MMBtu
TOTAL YEARLY COSTS $384,438
RECOMMENDED SAVINGS* $119,921 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $4,718 - $2,720
42,503
kWh
$1,998
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,889 $20,000 $6,855
107,103
kWh
$5,034
-
kW-mo/yr
-
03 2.7261: Install timers and/or thermostats $522 - $522
8,149
kWh
- -
04 2.7234: Use heat pump for space conditioning $1,070 $7,000 $617
9,638
kWh
$453
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,843 $12,500 $2,792
43,629
kWh
$2,051
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $2,662 $3,300 - - $2,662
-
MMBtu
07 2.2442: Preheat combustion air with waste heat $6,569 $4,900 - - $6,569
-
MMBtu
08 2.2515: Use optimum thickness insulation $17,976 $16,320 - - $17,976
-
MMBtu
09 2.4322: Use or replace with energy efficient substitutes $1,417 $7,500 $817
12,765
kWh
$600
-
kW-mo/yr
-
10 2.1221: Replace obsolete burners with more efficient ones $8,030 $55,000 - - $8,030
-
MMBtu
11 2.6126: Keep solid fuels / raw materials dry $60,225 $75,000 - - $60,225
-
MMBtu
TOTAL RECOMMENDED $119,921 $201,520 $14,323
223,787
kWh
$10,136
-
kW-mo/yr
$95,462
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs