Assessment Year | 1999 |
---|---|
Principal Product | Fabricated Aluminum Parts |
NAICS |
n/a
|
SIC | 3449: Miscellaneous Structural Metal Work |
Sales Range | $5 M to 10M |
# of Employees | 125 |
Plant Area |
45,750
ft2
|
Annual Production | 360,000
pieces
|
Production Hrs. Annual | 5,460
hrs
|
Location (State) | South Dakota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,213 | 2,147,128 |
kWh
|
$0.027 |
Electricity Demand | $31,062 | 4,668 |
kW-mo/yr
|
$6.65 |
Electricity Fees | $2,767 | - |
|
- |
Natural Gas | $5,001 | 1,027 |
MMBtu
|
$4.87 |
LPG | $477 | 20 |
MMBtu
|
$23.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,910 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,613 | $1,613 |
$1,179
43,669
kWh
|
$1,341
-
kW-mo/yr
|
$(-907.0)
-
MMBtu
|
- | - | - | |
02 | 3.4116: Meter recycled water (to reduce sewer charges) | $676 | $400 | - | - | - |
$676
-
Tgal
|
- | - | |
03 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $3,900 | $1,000 | - | - | - | - | - | $3,900 | |
04 | 4.211: Consider use / purchase of bulk materials where possible | $721 | $1,811 | - | - | - | - | $552 | $169 | |
TOTAL RECOMMENDED | $6,910 | $4,824 |
$1,179
43,669
kWh
|
$1,341
-
kW-mo/yr
|
$(-907.0)
-
MMBtu
|
$676
-
Tgal
|
$552 | $4,069 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs