ITAC Assessment: DS0142
ITAC logo
ITAC Assessment: DS0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Fabricated Aluminum Parts
NAICS
n/a
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $5
M
to 10
M
# of Employees 125
Plant Area 45,750
ft2
Annual Production 360,000
pieces
Production Hrs. Annual 5,460
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,213 2,147,128
kWh
Electricity Demand $31,062 4,668
kW-mo/yr
Electricity Fees $2,767 -
Natural Gas $5,001 1,027
MMBtu
LPG $477 20
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Primary Raw Material Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,613 $1,613 $1,179
43,669
kWh
$1,341
-
kW-mo/yr
$(-907.0)
-
MMBtu
- - -
02 3.4116: Meter recycled water (to reduce sewer charges) $676 $400 - - - $676
-
Tgal
- -
03 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,900 $1,000 - - - - - $3,900
04 4.211: Consider use / purchase of bulk materials where possible $721 $1,811 - - - - $552 $169
TOTAL RECOMMENDED $6,910 $4,824 $1,179
43,669
kWh
$1,341
-
kW-mo/yr
$(-907.0)
-
MMBtu
$676
-
Tgal
$552 $4,069
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs