ITAC Assessment: DL0238
ITAC logo
ITAC Assessment: DL0238
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product packaged dry food products
NAICS 311423: Dried and Dehydrated Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 592
Plant Area 900,000
ft2
Annual Production 107,000
ton
Production Hrs. Annual 7,224
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,123,752 43,731,684
kWh
Electricity Demand $747,293 74,751
kW-mo/yr
Electricity Fees $85,205 -
Natural Gas $417,861 62,550
MMBtu
Other Gas $1,128,433 87,840
MMBtu
Waste Disposal Costs
Water Usage $112,038 2,655,000
Tgal
TOTAL YEARLY COSTS $5,614,582
RECOMMENDED SAVINGS* $885,725 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings
01 2.4226: Use / purchase optimum sized compressor $236,055 $1,860,000 $107,332
1,511,723
kWh
$128,723
-
kW-mo/yr
- -
02 2.4224: Upgrade controls on compressors $21,276 $7,300 $16,784
236,400
kWh
$4,492
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $205,595 $34,400 $162,981
2,295,500
kWh
$42,614
-
kW-mo/yr
- -
04 2.2113: Repair or replace steam traps $112,874 $37,000 - - - $112,874
-
MMBtu
05 2.2437: Recover waste heat from equipment $40,888 $180,000 - - - $40,888
-
MMBtu
06 2.2135: Repair and eliminate steam leaks $56,437 $22,000 - - - $56,437
-
MMBtu
07 2.1392: Replace purchased steam with other energy source $212,600 $900,000 - - $(-916,144.0)
-
MMBtu
$1,128,744
-
MMBtu
TOTAL RECOMMENDED $885,725 $3,040,700 $287,097
4,043,623
kWh
$175,829
-
kW-mo/yr
$(-916,144.0)
-
MMBtu
$1,338,943
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs