| Assessment Year | 2023 |
|---|---|
| Principal Product | Canned soft drinks |
| NAICS | 312111: Soft Drink Manufacturing |
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $100 M to 500M |
| # of Employees | 62 |
| Plant Area |
50,000
ft2
|
| Annual Production | 27,000
Tgal
|
| Production Hrs. Annual | 7,956
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $584,514 | 4,717,046 |
kWh
|
$0.12 | |
| Electricity Demand | $74,502 | 10,708 |
kW-mo/yr
|
$6.96 | |
| Electricity Fees | $4,450 | - |
|
- | |
| Natural Gas | $166,751 | 16,861 |
MMBtu
|
$9.89 | |
| Waste Disposal Costs | |||||
| Water Usage | $45,722 | 5,421 |
Tgal
|
$8.43 | |
| TOTAL YEARLY COSTS | $875,939 | ||||
| RECOMMENDED SAVINGS* | $98,479 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $12,303 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.4152: Carefully control water level in mass finishing equipment | $4,024 | $700 | - | - |
$4,024
-
Tgal
|
|
| 02 | 2.6231: Utilize controls to operate equipment only when needed | $8,279 | - |
$8,279
59,133
kWh
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,322 | $37,499 |
$13,322
95,154
kWh
|
- | - | |
| 04 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $3,115 | $4,102 | - |
$3,115
-
MMBtu
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $22,512 | $73,200 |
$22,512
160,800
kWh
|
- | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $47,227 | $350 |
$47,227
337,334
kWh
|
- | - | |
| TOTAL RECOMMENDED | $98,479 | $115,851 |
$91,340
652,421
kWh
|
$3,115
-
MMBtu
|
$4,024
-
Tgal
|
||
| TOTAL IMPLEMENTED | $12,303 | $700 |
$8,279
59,133
kWh
|
- |
$4,024
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs