ITAC Assessment: DL0228
ITAC logo
ITAC Assessment: DL0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Canned soft drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 62
Plant Area 50,000
ft2
Annual Production 27,000
Tgal
Production Hrs. Annual 7,956
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $584,514 4,717,046
kWh
Electricity Demand $74,502 10,708
kW-mo/yr
Electricity Fees $4,450 -
Natural Gas $166,751 16,861
MMBtu
Waste Disposal Costs
Water Usage $45,722 5,421
Tgal
TOTAL YEARLY COSTS $875,939
RECOMMENDED SAVINGS* $98,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,303

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings
01 3.4152: Carefully control water level in mass finishing equipment $4,024 $700 - - $4,024
-
Tgal
02 2.6231: Utilize controls to operate equipment only when needed $8,279 - $8,279
59,133
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,322 $37,499 $13,322
95,154
kWh
- -
04 2.2426: Use waste heat from flue gases to heat space conditioning air $3,115 $4,102 - $3,115
-
MMBtu
-
05 2.2437: Recover waste heat from equipment $22,512 $73,200 $22,512
160,800
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $47,227 $350 $47,227
337,334
kWh
- -
TOTAL RECOMMENDED $98,479 $115,851 $91,340
652,421
kWh
$3,115
-
MMBtu
$4,024
-
Tgal
TOTAL IMPLEMENTED $12,303 $700 $8,279
59,133
kWh
- $4,024
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs