ITAC Assessment: OR0378
ITAC logo
ITAC Assessment: OR0378
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 20,800
thousand feet
Production Hrs. Annual 2,340
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,273 1,743,552
kWh
Electricity Demand $26,893 100,224
kW-mo/yr
Electricity Fees $5,618 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,568 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,995

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,287 $1,000 $1,046
30,481
kWh
$241
-
kW-mo/yr
- -
02 2.4224: Upgrade controls on compressors $2,967 $4,000 $2,358
68,581
kWh
$609
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $732 - $583
16,999
kWh
$149
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $2,340 $6,500 - - $2,340 -
05 2.4133: Use most efficient type of electric motors $1,503 $4,033 $981
28,722
kWh
$522
-
kW-mo/yr
- -
06 2.4322: Use or replace with energy efficient substitutes $1,506 $3,800 $931
27,257
kWh
$575
-
kW-mo/yr
- -
07 3.4151: Minimize water usage $1,233 $4,701 $(-70.0)
(-2,052)
kWh
$(-16.0)
-
kW-mo/yr
- $1,319
-
Tgal
TOTAL RECOMMENDED $11,568 $24,034 $5,829
169,988
kWh
$2,080
-
kW-mo/yr
$2,340 $1,319
-
Tgal
TOTAL IMPLEMENTED $7,995 $12,833 $5,899
172,040
kWh
$2,096
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs