| Assessment Year | 2000 |
|---|---|
| Principal Product | lumber |
| NAICS |
n/a
|
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
n/a
|
| Annual Production | 20,800
thousand feet
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $61,273 | 1,743,552 |
kWh
|
$0.035 |
| Electricity Demand | $26,893 | 100,224 |
kW-mo/yr
|
$0.27 |
| Electricity Fees | $5,618 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,568 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,995 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,287 | $1,000 |
$1,046
30,481
kWh
|
$241
-
kW-mo/yr
|
- | - | |
| 02 | 2.4224: Upgrade controls on compressors | $2,967 | $4,000 |
$2,358
68,581
kWh
|
$609
-
kW-mo/yr
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $732 | - |
$583
16,999
kWh
|
$149
-
kW-mo/yr
|
- | - | |
| 04 | 2.3212: Optimize plant power factor | $2,340 | $6,500 | - | - | $2,340 | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $1,503 | $4,033 |
$981
28,722
kWh
|
$522
-
kW-mo/yr
|
- | - | |
| 06 | 2.4322: Use or replace with energy efficient substitutes | $1,506 | $3,800 |
$931
27,257
kWh
|
$575
-
kW-mo/yr
|
- | - | |
| 07 | 3.4151: Minimize water usage | $1,233 | $4,701 |
$(-70.0)
(-2,052)
kWh
|
$(-16.0)
-
kW-mo/yr
|
- |
$1,319
-
Tgal
|
|
| TOTAL RECOMMENDED | $11,568 | $24,034 |
$5,829
169,988
kWh
|
$2,080
-
kW-mo/yr
|
$2,340 |
$1,319
-
Tgal
|
||
| TOTAL IMPLEMENTED | $7,995 | $12,833 |
$5,899
172,040
kWh
|
$2,096
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs