Assessment Year | 2023 |
---|---|
Principal Product | Sewer water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 47 |
Plant Area |
650,000
ft2
|
Annual Production | 29,053,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,722,287 | 18,898,075 |
kWh
|
$0.091 |
Electricity Demand | $270,252 | 46,525 |
kW-mo/yr
|
$5.81 |
Electricity Fees | $7,898 | - |
|
- |
Natural Gas | $630,860 | 65,052 |
MMBtu
|
$9.70 |
TOTAL YEARLY COSTS | $2,631,297 | |||
RECOMMENDED SAVINGS* | $1,028,242 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $284,896 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $577,300 | $470,000 |
$577,300
5,498,000
kWh
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $124,500 | $181,000 |
$124,500
1,186,000
kWh
|
|
03 | 2.4322: Use or replace with energy efficient substitutes | $93,960 | $250,000 |
$93,960
894,900
kWh
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $70,880 | $80,000 |
$70,880
675,000
kWh
|
|
05 | 2.1331: Burn a less expensive grade of fuel | $48,610 | - |
$48,610
463,000
kWh
|
|
06 | 2.2437: Recover waste heat from equipment | $12,154 | $50,000 |
$12,154
115,750
kWh
|
|
07 | 2.6231: Utilize controls to operate equipment only when needed | $5,672 | - |
$5,672
54,020
kWh
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $70,620 | $19,500 |
$70,620
672,571
kWh
|
|
09 | 2.7234: Use heat pump for space conditioning | $24,546 | $50,000 |
$24,546
233,775
kWh
|
|
TOTAL RECOMMENDED | $1,028,242 | $1,100,500 |
$1,028,242
9,793,016
kWh
|
||
TOTAL IMPLEMENTED | $284,896 | $481,000 |
$284,896
2,713,670
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs