ITAC Assessment: DL0216
ITAC logo
ITAC Assessment: DL0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Sewer water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 47
Plant Area 650,000
ft2
Annual Production 29,053,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,722,287 18,898,075
kWh
Electricity Demand $270,252 46,525
kW-mo/yr
Electricity Fees $7,898 -
Natural Gas $630,860 65,052
MMBtu
TOTAL YEARLY COSTS $2,631,297
RECOMMENDED SAVINGS* $1,028,242 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $284,896

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $577,300 $470,000 $577,300
5,498,000
kWh
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $124,500 $181,000 $124,500
1,186,000
kWh
03 2.4322: Use or replace with energy efficient substitutes $93,960 $250,000 $93,960
894,900
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $70,880 $80,000 $70,880
675,000
kWh
05 2.1331: Burn a less expensive grade of fuel $48,610 - $48,610
463,000
kWh
06 2.2437: Recover waste heat from equipment $12,154 $50,000 $12,154
115,750
kWh
07 2.6231: Utilize controls to operate equipment only when needed $5,672 - $5,672
54,020
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $70,620 $19,500 $70,620
672,571
kWh
09 2.7234: Use heat pump for space conditioning $24,546 $50,000 $24,546
233,775
kWh
TOTAL RECOMMENDED $1,028,242 $1,100,500 $1,028,242
9,793,016
kWh
TOTAL IMPLEMENTED $284,896 $481,000 $284,896
2,713,670
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs