Assessment Year | 2022 |
---|---|
Principal Product | Large metal structures |
NAICS | 335313: Switchgear and Switchboard Apparatus Manufacturing |
SIC | 3613: Switchgear and Switchboard Apparatus |
Sales Range | $1 M to 5M |
# of Employees | 47 |
Plant Area |
40,000
ft2
|
Annual Production | 200
units
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $38,632 | 472,559 |
kWh
|
$0.082 | |
Electricity Demand | $11,287 | 1,470 |
kW-mo/yr
|
$7.68 | |
Electricity Fees | $8,798 | - |
|
- | |
Natural Gas | $15,021 | 1,720 |
MMBtu
|
$8.73 | |
Waste Disposal Costs | |||||
Water Usage | $9,308 | 461 |
Tgal
|
$20.19 | |
TOTAL YEARLY COSTS | $83,046 | ||||
RECOMMENDED SAVINGS* | $19,610 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $11,700 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $2,027 | - |
$1,522
18,568
kWh
|
$428
-
kW-mo/yr
|
$77
-
MMBtu
|
|
02 | 2.6231: Utilize controls to operate equipment only when needed | $383 | $315 |
$299
3,651
kWh
|
$84
-
kW-mo/yr
|
- | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $182 | - |
$69
838
kWh
|
$19
-
kW-mo/yr
|
$94
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $100 | $400 |
$78
957
kWh
|
$22
-
kW-mo/yr
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $557 | $1,000 |
$435
5,308
kWh
|
$122
-
kW-mo/yr
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,522 | $1,016 |
$1,970
24,020
kWh
|
$552
-
kW-mo/yr
|
- | |
07 | 2.2437: Recover waste heat from equipment | $801 | $449 | - | - |
$801
-
MMBtu
|
|
08 | 2.7234: Use heat pump for space conditioning | $3,608 | $4,012 |
$2,818
34,363
kWh
|
$790
-
kW-mo/yr
|
- | |
09 | 2.7226: Use computer programs to optimize hvac performance | $2,543 | $6,428 |
$1,269
15,481
kWh
|
$356
-
kW-mo/yr
|
$918
-
MMBtu
|
|
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,800 | $6,208 |
$3,027
36,912
kWh
|
$773
-
kW-mo/yr
|
- | |
11 | 2.2511: Insulate bare equipment | $797 | $2,124 | - | - |
$797
-
MMBtu
|
|
12 | 2.7243: Improve air circulation with destratification fans / other methods | $298 | $1,434 | - | - |
$298
-
MMBtu
|
|
13 | 2.1134: Eliminate leaks in combustible gas lines | $1,993 | $2,500 | - | - |
$1,993
-
MMBtu
|
|
TOTAL RECOMMENDED | $19,610 | $25,886 |
$11,487
140,098
kWh
|
$3,145
-
kW-mo/yr
|
$4,978
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,700 | $11,173 |
$6,954
84,808
kWh
|
$1,875
-
kW-mo/yr
|
$2,871
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs