ITAC Assessment: DL0206
ITAC logo
ITAC Assessment: DL0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Analytical instruments
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 32,400
ft2
Annual Production 263
units
Production Hrs. Annual 3,165
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,129 596,941
kWh
Electricity Demand $11,508 1,845
kW-mo/yr
Electricity Fees $900 -
Natural Gas $5,898 652
MMBtu
Waste Disposal Costs
Water Usage $4,837 96
Tgal
TOTAL YEARLY COSTS $88,272
RECOMMENDED SAVINGS* $27,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,684

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $917 - $781
7,166
kWh
$136
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $1,866 - $958
8,793
kWh
$167
-
kW-mo/yr
$741
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $1,292 - $546
5,070
kWh
$103
-
kW-mo/yr
$643
-
MMBtu
04 2.4322: Use or replace with energy efficient substitutes $14,028 $27,352 $11,946
109,604
kWh
$2,082
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,447 $8,852 $8,044
73,803
kWh
$1,403
-
kW-mo/yr
-
TOTAL RECOMMENDED $27,550 $36,204 $22,275
204,436
kWh
$3,891
-
kW-mo/yr
$1,384
-
MMBtu
TOTAL IMPLEMENTED $25,684 $36,204 $21,317
195,643
kWh
$3,724
-
kW-mo/yr
$643
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs