Assessment Year | 2022 |
---|---|
Principal Product | Analytical instruments |
NAICS | 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial |
SIC | 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products |
Sales Range | $10 M to 50M |
# of Employees | 34 |
Plant Area |
32,400
ft2
|
Annual Production | 263
units
|
Production Hrs. Annual | 3,165
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $65,129 | 596,941 |
kWh
|
$0.11 | |
Electricity Demand | $11,508 | 1,845 |
kW-mo/yr
|
$6.24 | |
Electricity Fees | $900 | - |
|
- | |
Natural Gas | $5,898 | 652 |
MMBtu
|
$9.05 | |
Waste Disposal Costs | |||||
Water Usage | $4,837 | 96 |
Tgal
|
$50.39 | |
TOTAL YEARLY COSTS | $88,272 | ||||
RECOMMENDED SAVINGS* | $27,550 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $25,684 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $917 | - |
$781
7,166
kWh
|
$136
-
kW-mo/yr
|
- | |
02 | 2.6218: Turn off equipment when not in use | $1,866 | - |
$958
8,793
kWh
|
$167
-
kW-mo/yr
|
$741
-
MMBtu
|
|
03 | 2.7221: Lower temperature during the winter season and vice-versa | $1,292 | - |
$546
5,070
kWh
|
$103
-
kW-mo/yr
|
$643
-
MMBtu
|
|
04 | 2.4322: Use or replace with energy efficient substitutes | $14,028 | $27,352 |
$11,946
109,604
kWh
|
$2,082
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,447 | $8,852 |
$8,044
73,803
kWh
|
$1,403
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $27,550 | $36,204 |
$22,275
204,436
kWh
|
$3,891
-
kW-mo/yr
|
$1,384
-
MMBtu
|
||
TOTAL IMPLEMENTED | $25,684 | $36,204 |
$21,317
195,643
kWh
|
$3,724
-
kW-mo/yr
|
$643
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs