Assessment Year | 2022 |
---|---|
Principal Product | Logistics service provider for restaurant chains |
NAICS | 541614: Process, Physical Distribution, and Logistics Consulting Services |
SIC | 4731: Arrangement of Transportation of Freight and Cargo |
Sales Range | $10 M to 50M |
# of Employees | 280 |
Plant Area |
172,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $474,323 | 5,438,863 |
kWh
|
$0.087 | |
Electricity Demand | $45,059 | 11,265 |
kW-mo/yr
|
$4.00 | |
Electricity Fees | $6,000 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $30,613 | 3,219 |
Tgal
|
$9.51 | |
TOTAL YEARLY COSTS | $555,995 | ||||
RECOMMENDED SAVINGS* | $84,866 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $26,378 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $7,105 | - |
$7,105
74,786
kWh
|
|
02 | 2.6231: Utilize controls to operate equipment only when needed | $2,593 | $750 |
$2,593
27,297
kWh
|
|
03 | 2.6231: Utilize controls to operate equipment only when needed | $3,460 | $1,000 |
$3,460
36,419
kWh
|
|
04 | 3.6124: Burn waste oil for heat | $12,350 | $5,000 |
$12,350
130,000
kWh
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $37,058 | $24,746 |
$37,058
390,087
kWh
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $870 | - |
$870
9,155
kWh
|
|
07 | 2.4322: Use or replace with energy efficient substitutes | $530 | $1,035 |
$530
5,578
kWh
|
|
08 | 2.2437: Recover waste heat from equipment | $20,900 | $50,000 |
$20,900
220,000
kWh
|
|
TOTAL RECOMMENDED | $84,866 | $82,531 |
$84,866
893,322
kWh
|
||
TOTAL IMPLEMENTED | $26,378 | $6,750 |
$26,378
277,657
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs