Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Consumer-cooked food assemblies
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 90,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 5,694
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,225 1,684,864
kWh
Electricity Demand $22,571 4,249
kW-mo/yr
Electricity Fees $67,091 -
Natural Gas $11,919 1,148
MMBtu
Waste Disposal Costs
Water Usage $12,174 169,400
Tgal
TOTAL YEARLY COSTS $342,980
RECOMMENDED SAVINGS* $68,349 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,137

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,137 $8,000 $9,367
68,874
kWh
$770
-
kW-mo/yr
-
02 2.6231: Utilize controls to operate equipment only when needed $3,948 $192 $1,985
13,320
kWh
- $1,963
-
MMBtu
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $3,765 $382 $3,000
22,066
kWh
$765
-
kW-mo/yr
-
04 2.7311: Ventilation system to shut off when room is not in use $2,018 - $1,000
6,710
kWh
- $1,018
-
MMBtu
05 2.7311: Ventilation system to shut off when room is not in use $1,205 - $1,205
8,087
kWh
- -
06 2.2622: Replace existing chiller with high efficiency model $31,647 $428,406 $31,647
212,400
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $7,657 $32,101 $7,657
51,388
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $7,972 $48,444 $7,972
53,505
kWh
- -
TOTAL RECOMMENDED $68,349 $517,525 $63,833
436,350
kWh
$1,535
-
kW-mo/yr
$2,981
-
MMBtu
TOTAL IMPLEMENTED $10,137 $8,000 $9,367
68,874
kWh
$770
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs