ITAC Assessment: DL0165
ITAC logo
ITAC Assessment: DL0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Treated Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 100,000
ft2
Annual Production 2,055,250
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $542,732 9,687,681
kWh
Natural Gas $7,006 1,281
MMBtu
TOTAL YEARLY COSTS $549,738
RECOMMENDED SAVINGS* $23,771 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,008

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,622 $1,000 $2,622
46,820
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,190 $1,000 $9,190
164,086
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $920 $6,285 $920
16,350
kWh
-
04 2.6231: Utilize controls to operate equipment only when needed $3,410 $1,235 $3,410
60,970
kWh
-
05 2.6231: Utilize controls to operate equipment only when needed $366 $253 $366
6,530
kWh
-
06 2.6232: Install set-back timers $2,512 $253 $510
9,120
kWh
$2,002
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $163 - $28
492
kWh
$135
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $940 $3,431 $940
16,820
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,618 $11,052 $1,618
28,894
kWh
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $2,030 $8,740 $2,030
36,270
kWh
-
TOTAL RECOMMENDED $23,771 $33,249 $21,634
386,352
kWh
$2,137
-
MMBtu
TOTAL IMPLEMENTED $11,008 $31,014 $9,006
160,804
kWh
$2,002
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs