Assessment Year | 2015 |
---|---|
Principal Product | Plastics Packaging |
NAICS | 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $10 M to 50M |
# of Employees | 184 |
Plant Area |
89,251
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,890
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $46,461 | 839,135 |
kWh
|
$0.055 |
Electricity Demand | $34,101 | 2,211 |
kW-mo/yr
|
$15.42 |
Electricity Fees | $3,529 | - |
|
- |
LPG | $66,743 | 2,364 |
MMBtu
|
$28.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,685 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,375 | $19,745 |
$5,340
97,140
kWh
|
$2,035
-
kW-mo/yr
|
- | |
02 | 2.2437: Recover waste heat from equipment | $11,510 | $2,330 | - | - |
$11,510
-
MMBtu
|
|
03 | 2.7234: Use heat pump for space conditioning | $4,240 | $9,280 |
$(-1,030.0)
(-18,720)
kWh
|
$(-400.0)
-
kW-mo/yr
|
$5,670
-
MMBtu
|
|
04 | 2.7314: Reduce ventilation air | $850 | - |
$620
11,250
kWh
|
$230
-
kW-mo/yr
|
- | |
05 | 2.7261: Install timers and/or thermostats | $6,100 | $710 | - | - |
$6,100
-
MMBtu
|
|
06 | 2.7221: Lower temperature during the winter season and vice-versa | $2,120 | - | - | - |
$2,120
-
MMBtu
|
|
07 | 2.7261: Install timers and/or thermostats | $320 | $710 | - | - |
$320
-
MMBtu
|
|
08 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $320 | $90 | - | - |
$320
-
MMBtu
|
|
09 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $810 | $700 | - | - |
$810
-
MMBtu
|
|
10 | 2.7243: Improve air circulation with destratification fans / other methods | $4,040 | $22,500 | - | - |
$4,040
-
MMBtu
|
|
TOTAL RECOMMENDED | $37,685 | $56,065 |
$4,930
89,670
kWh
|
$1,865
-
kW-mo/yr
|
$30,890
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs