ITAC Assessment: OK0987
ITAC logo
ITAC Assessment: OK0987
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product bio solids from wastewater treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $500
k
to 1
M
# of Employees 5
Plant Area 2,614,000
ft2
Annual Production 227
ton
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,846 1,477,339
kWh
TOTAL YEARLY COSTS $107,846
RECOMMENDED SAVINGS* $60,549 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,314

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,955 $3,992 $14,955
204,864
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,870 $3,453 $2,870
39,312
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,489 $5,994 $2,489
34,096
kWh
04 2.9111: Use solar heat to heat make-up air $40,235 $560,000 $40,235
551,160
kWh
TOTAL RECOMMENDED $60,549 $573,439 $60,549
829,432
kWh
TOTAL IMPLEMENTED $20,314 $13,439 $20,314
278,272
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs