Assessment Year | 2015 |
---|---|
Principal Product | Licorice Extract |
NAICS | 311340: Nonchocolate Confectionery Manufacturing |
SIC | 2064: Candy and Other Confectionery Products |
Sales Range | $100 M to 500M |
# of Employees | 140 |
Plant Area |
390,000
ft2
|
Annual Production | 6,000
ton
|
Production Hrs. Annual | 6,762
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $676,179 | 8,016,000 |
kWh
|
$0.084 |
Electricity Demand | $70,872 | 46,192 |
kW-mo/yr
|
$1.53 |
Electricity Fees | $195,923 | - |
|
- |
Natural Gas | $1,275,680 | 207,657 |
MMBtu
|
$6.14 |
Fuel Oil #1 | $240,128 | 8,960 |
MMBtu
|
$26.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $379,525 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $171,145 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $165,235 | $79,620 | - |
$165,235
-
MMBtu
|
|
02 | 2.7231: Use radiant heater for spot heating | $81,150 | - | - |
$81,150
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $65,410 | $20,000 |
$65,410
554,340
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,355 | $7,475 |
$11,355
96,230
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,660 | $19,415 |
$12,660
107,260
kWh
|
- | |
06 | 2.6231: Utilize controls to operate equipment only when needed | $4,465 | $650 |
$3,240
27,430
kWh
|
$1,225
-
MMBtu
|
|
07 | 2.2437: Recover waste heat from equipment | $5,870 | $1,700 | - |
$5,870
-
MMBtu
|
|
08 | 2.6218: Turn off equipment when not in use | $6,480 | - |
$6,480
77,180
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,280 | $61,980 |
$11,280
95,590
kWh
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,645 | $13,720 |
$5,645
51,650
kWh
|
- | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,660 | $21,550 |
$7,660
64,910
kWh
|
- | |
12 | 2.7226: Use computer programs to optimize hvac performance | $2,315 | - |
$2,315
19,620
kWh
|
- | |
TOTAL RECOMMENDED | $379,525 | $226,110 |
$126,045
1,094,210
kWh
|
$253,480
-
MMBtu
|
||
TOTAL IMPLEMENTED | $171,145 | $117,250 |
$89,995
766,490
kWh
|
$81,150
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs