Assessment Year | 2014 |
---|---|
Principal Product | Asphalt shingles |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 67 |
Plant Area |
570,000
ft2
|
Annual Production | 4,300,000
pieces
|
Production Hrs. Annual | 6,260
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $535,934 | 5,379,402 |
kWh
|
$0.100 |
Natural Gas | $651,610 | 81,924 |
MMBtu
|
$7.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $85,335 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $82,535 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $60,975 | $50,000 | - |
$60,975
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,940 | $11,600 |
$11,940
119,360
kWh
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,610 | $1,020 |
$1,610
16,100
kWh
|
- | |
04 | 2.4226: Use / purchase optimum sized compressor | $4,030 | $20,000 |
$4,030
40,280
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,590 | - |
$5,590
55,860
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,190 | $6,400 |
$1,190
11,900
kWh
|
- | |
TOTAL RECOMMENDED | $85,335 | $89,020 |
$24,360
243,500
kWh
|
$60,975
-
MMBtu
|
||
TOTAL IMPLEMENTED | $82,535 | $81,600 |
$21,560
215,500
kWh
|
$60,975
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs