ITAC Assessment: DL0136
ITAC logo
ITAC Assessment: DL0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Asphalt shingles
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 570,000
ft2
Annual Production 4,300,000
pieces
Production Hrs. Annual 6,260
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $535,934 5,379,402
kWh
Natural Gas $651,610 81,924
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $82,535

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $60,975 $50,000 - $60,975
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,940 $11,600 $11,940
119,360
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,610 $1,020 $1,610
16,100
kWh
-
04 2.4226: Use / purchase optimum sized compressor $4,030 $20,000 $4,030
40,280
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,590 - $5,590
55,860
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,190 $6,400 $1,190
11,900
kWh
-
TOTAL RECOMMENDED $85,335 $89,020 $24,360
243,500
kWh
$60,975
-
MMBtu
TOTAL IMPLEMENTED $82,535 $81,600 $21,560
215,500
kWh
$60,975
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs