ITAC Assessment: AS0288
ITAC logo
ITAC Assessment: AS0288
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Dispersion Systems, Extended Range Munitions, Gas Generators
NAICS
n/a
SIC 3483: Ammunition, Except for Small Arms
Sales Range $10
M
to 50
M
# of Employees 59
Plant Area 500,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 2,588
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,921 4,172,626
kWh
Electricity Demand $31,725 11,697
kW-mo/yr
Electricity Fees $17,927 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,176

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,163 $2,397 $512
13,189
kWh
$651
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $468 $1,130 $206
5,569
kWh
$262
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,416 $3,589 $1,035
26,671
kWh
$1,381
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $488 $1,275 $213
5,569
kWh
$275
-
kW-mo/yr
- -
05 2.7232: Replace existing hvac unit with high efficiency model $15,129 $11,400 $10,228
262,896
kWh
$4,901
-
kW-mo/yr
- -
06 2.4133: Use most efficient type of electric motors $3,100 $11,396 $1,218
31,360
kWh
$1,882
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,959 - $1,276
32,825
kWh
$1,683
-
kW-mo/yr
- -
08 3.5217: Reuse / recycle/ sell paper products $668 $120 - - $668
-
lb
-
09 3.5316: Contract a wood pallet recycling company $2,700 $60 - - $2,700
-
lb
-
10 4.424: Improve space comfort conditioning $4,649 $12,600 - - - $4,649
TOTAL RECOMMENDED $33,740 $43,967 $14,688
378,079
kWh
$11,035
-
kW-mo/yr
$3,368
-
lb
$4,649
TOTAL IMPLEMENTED $19,176 $18,516 $11,981
308,325
kWh
$7,195
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs