Assessment Year | 2014 |
---|---|
Principal Product | Polystyrene products |
NAICS | 326140: Polystyrene Foam Product Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 108 |
Plant Area |
196,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,376
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $316,091 | 2,791,600 |
kWh
|
$0.11 |
Natural Gas | $317,103 | 56,579 |
MMBtu
|
$5.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $113,447 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $63,690 | $134,000 |
$63,690
563,600
kWh
|
- | - | - | |
02 | 2.2441: Preheat boiler makeup water with waste process heat | $11,540 | $18,000 | - |
$11,540
-
MMBtu
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,385 | - |
$10,385
91,900
kWh
|
- | - | - | |
04 | 2.4224: Upgrade controls on compressors | $7,800 | $6,000 |
$7,800
69,000
kWh
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,170 | $4,000 |
$3,170
28,060
kWh
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,710 | $26,460 |
$6,710
59,360
kWh
|
- | - | - | |
07 | 2.1123: Install automatic stack damper | $3,680 | $550 | - |
$3,680
-
MMBtu
|
- | - | |
08 | 3.4115: Recover and reuse cooling water | $5,180 | $15,600 | - | - |
$2,940
-
Tgal
|
$2,240
-
Tgal
|
|
09 | 2.7314: Reduce ventilation air | $1,110 | - |
$1,110
9,810
kWh
|
- | - | - | |
10 | 2.7314: Reduce ventilation air | $182 | $235 |
$52
460
kWh
|
$130
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $113,447 | $204,845 |
$92,917
822,190
kWh
|
$15,350
-
MMBtu
|
$2,940
-
Tgal
|
$2,240
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs