ITAC Assessment: DL0094
ITAC logo
ITAC Assessment: DL0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product speed increasers/decreasers
NAICS 333612: Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 40,000
ft2
Annual Production 50
units
Production Hrs. Annual 3,224
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,029 546,640
kWh
Electricity Demand $32,988 3,372
kW-mo/yr
Natural Gas $14,504 1,144
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,531 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $4,550 - $4,550
28,500
kWh
- -
02 2.6218: Turn off equipment when not in use $2,797 $12,000 $2,117
30,240
kWh
$680
-
kW-mo/yr
-
03 2.2531: Re-size charging openings or add movable cover or door $4,058 $1,450 - - $4,058
-
MMBtu
04 2.7229: Air condition only space necessary $780 - $780
4,900
kWh
- -
05 2.7224: Reduce space conditioning during non-working hours $384 - $384
3,285
kWh
- -
06 2.7243: Improve air circulation with destratification fans / other methods $2,392 $7,320 $(-349.3)
(-2,283)
kWh
- $2,741
-
MMBtu
07 2.6231: Utilize controls to operate equipment only when needed $570 $10 $570
3,570
kWh
- -
TOTAL RECOMMENDED $15,531 $20,780 $8,052
68,212
kWh
$680
-
kW-mo/yr
$6,799
-
MMBtu
TOTAL IMPLEMENTED $5,330 - $5,330
33,400
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs