ITAC Assessment: DL0074
ITAC logo
ITAC Assessment: DL0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Fiberglass reinforced plastic (FRP) tanks, vessels, equipment, pipe and
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 66
Plant Area 46,000
ft2
Annual Production 475,000
lb
Production Hrs. Annual 2,742
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,421 451,121
kWh
LPG $39,038 1,750
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,760 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.4131: Size electric motors for peak operating efficiency $6,390 $2,000 $6,390
51,140
kWh
-
02 2.7496: Install partitions to reduce size of conditioned space $12,050 $4,500 - $12,050
-
MMBtu
03 2.6125: Keep equipment clean $9,770 $2,000 - $9,770
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $3,870 $39,300 $(-810.0)
(-6,490)
kWh
$4,680
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $13,165 $87,400 - $13,165
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,380 $17,150 $5,380
43,000
kWh
-
07 2.2437: Recover waste heat from equipment $3,320 $1,900 - $3,320
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,345 $6,300 $2,345
18,750
kWh
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $960 $300 $960
7,700
kWh
-
10 2.4221: Install compressor air intakes in coolest locations $510 $1,300 $510
4,100
kWh
-
TOTAL RECOMMENDED $57,760 $162,150 $14,775
118,200
kWh
$42,985
-
MMBtu
TOTAL IMPLEMENTED $32,040 $11,700 $6,900
55,240
kWh
$25,140
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs