ITAC Assessment: DL0049
ITAC logo
ITAC Assessment: DL0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Latex Paints
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $100
M
to 500
M
# of Employees 110
Plant Area 178,000
ft2
Annual Production 15,000
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $364,447 4,935,386
kWh
Electricity Demand $31,085 987
kW-mo/yr
Natural Gas $89,806 5,998
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $164,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $155,174

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,599 $50 $3,599
44,436
kWh
-
02 2.6124: Establish equipment maintenance schedule $35,889 $1,500 - $35,889
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $43,192 $2,000 $43,192
533,232
kWh
-
04 2.1231: Establish burner maintenance schedule for boilers $7,180 $1,000 - $7,180
-
MMBtu
05 2.2113: Repair or replace steam traps $17,413 $2,500 - $17,413
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $5,857 $2,180 $5,857
72,314
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $51,500 $30,000 $51,500
645,000
kWh
-
08 2.3512: De-energize excess transformer capacity $190 $435 $190
2,330
kWh
-
TOTAL RECOMMENDED $164,820 $39,665 $104,338
1,297,312
kWh
$60,482
-
MMBtu
TOTAL IMPLEMENTED $155,174 $37,000 $94,692
1,178,232
kWh
$60,482
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs