| Assessment Year | 2010 |
|---|---|
| Principal Product | Latex Paints |
| NAICS | 325510: Paint and Coating Manufacturing |
| SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
| Sales Range | $100 M to 500M |
| # of Employees | 110 |
| Plant Area |
178,000
ft2
|
| Annual Production | 15,000
Tgal
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Delaware |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $364,447 | 4,935,386 |
kWh
|
$0.074 |
| Electricity Demand | $31,085 | 987 |
kW-mo/yr
|
$31.49 |
| Natural Gas | $89,806 | 5,998 |
MMBtu
|
$14.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $164,820 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $155,174 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,599 | $50 |
$3,599
44,436
kWh
|
- | |
| 02 | 2.6124: Establish equipment maintenance schedule | $35,889 | $1,500 | - |
$35,889
-
MMBtu
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $43,192 | $2,000 |
$43,192
533,232
kWh
|
- | |
| 04 | 2.1231: Establish burner maintenance schedule for boilers | $7,180 | $1,000 | - |
$7,180
-
MMBtu
|
|
| 05 | 2.2113: Repair or replace steam traps | $17,413 | $2,500 | - |
$17,413
-
MMBtu
|
|
| 06 | 2.4221: Install compressor air intakes in coolest locations | $5,857 | $2,180 |
$5,857
72,314
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $51,500 | $30,000 |
$51,500
645,000
kWh
|
- | |
| 08 | 2.3512: De-energize excess transformer capacity | $190 | $435 |
$190
2,330
kWh
|
- | |
| TOTAL RECOMMENDED | $164,820 | $39,665 |
$104,338
1,297,312
kWh
|
$60,482
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $155,174 | $37,000 |
$94,692
1,178,232
kWh
|
$60,482
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs