Assessment Year | 2010 |
---|---|
Principal Product | Aerospace Ceramic Cores |
NAICS | 327120: Clay Building Material and Refractories Manufacturing |
SIC | 3297: Nonclay Refractories |
Sales Range | $10 M to 50M |
# of Employees | 203 |
Plant Area |
40,000
ft2
|
Annual Production | 8,400,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $326,381 | 2,758,277 |
kWh
|
$0.12 |
Electricity Demand | $78,456 | 6,067 |
kW-mo/yr
|
$12.93 |
Electricity Fees | $8,946 | - |
|
- |
Natural Gas | $598,436 | 45,339 |
MMBtu
|
$13.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,743 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,475 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $25,056 | $100 |
$25,056
167,040
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,459 | $100 |
$2,459
16,396
kWh
|
- | |
03 | 2.7261: Install timers and/or thermostats | $6,420 | $112 | - |
$6,420
-
MMBtu
|
|
04 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $2,452 | $1,310 | - |
$2,452
-
MMBtu
|
|
05 | 2.7221: Lower temperature during the winter season and vice-versa | $13,596 | - | - |
$13,596
-
MMBtu
|
|
06 | 2.7135: Install occupancy sensors | $1,760 | $1,050 |
$1,760
12,290
kWh
|
- | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $20,000 | $41,400 |
$20,000
140,370
kWh
|
- | |
TOTAL RECOMMENDED | $71,743 | $44,072 |
$49,275
336,096
kWh
|
$22,468
-
MMBtu
|
||
TOTAL IMPLEMENTED | $22,475 | $212 |
$2,459
16,396
kWh
|
$20,016
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs