| Assessment Year | 2009 |
|---|---|
| Principal Product | Metal Vessels |
| NAICS | 332312: Fabricated Structural Metal Manufacturing |
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $5 M to 10M |
| # of Employees | 25 |
| Plant Area |
57,000
ft2
|
| Annual Production | 5,900,000
units
|
| Production Hrs. Annual | 3,234
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $57,733 | 352,600 |
kWh
|
$0.16 |
| Natural Gas | $53,414 | 4,509 |
MMBtu
|
$11.85 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,639 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,837 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $5,400 | $3,600 | - |
$5,400
-
MMBtu
|
|
| 02 | 2.7243: Improve air circulation with destratification fans / other methods | $3,702 | $5,000 |
$(-198.0)
(-1,200)
kWh
|
$3,900
-
MMBtu
|
|
| 03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $3,700 | $4,440 | - |
$3,700
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,489 | $55,984 |
$10,489
63,568
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,600 | $4,000 |
$5,600
35,000
kWh
|
- | |
| 06 | 2.4322: Use or replace with energy efficient substitutes | $2,735 | $18,313 |
$2,735
16,850
kWh
|
- | |
| 07 | 2.6218: Turn off equipment when not in use | $700 | - |
$700
4,350
kWh
|
- | |
| 08 | 2.7131: Add area lighting switches | $313 | $197 |
$313
1,900
kWh
|
- | |
| TOTAL RECOMMENDED | $32,639 | $91,534 |
$19,639
120,468
kWh
|
$13,000
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $19,837 | $78,494 |
$19,837
121,668
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs