ITAC Assessment: DL0031
ITAC logo
ITAC Assessment: DL0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Nutritional Supplements for animals/humans
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 200,000
ft2
Annual Production 3,289,595
units
Production Hrs. Annual 4,680
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $540,524 4,342,971
kWh
Natural Gas $35,687 2,626
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,446

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $3,200 - $3,200
24,000
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $693 - $693
5,460
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,826 - $2,826
22,248
kWh
-
04 2.7135: Install occupancy sensors $2,224 - $2,224
17,515
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,809 $229 $1,809
14,242
kWh
-
06 2.7491: Insulate glazing, walls, ceilings, and roofs $7,857 $5,600 $7,857
61,685
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,430 - $7,430
58,500
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $5,757 - $5,757
45,338
kWh
-
09 2.7243: Improve air circulation with destratification fans / other methods $3,944 $7,500 $(-406.0)
(-3,200)
kWh
$4,350
-
MMBtu
TOTAL RECOMMENDED $35,740 $13,329 $31,390
245,788
kWh
$4,350
-
MMBtu
TOTAL IMPLEMENTED $6,446 $7,729 $2,096
16,502
kWh
$4,350
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs