Assessment Year | 2008 |
---|---|
Principal Product | Laundry Services |
NAICS | 812320: Drycleaning and Laundry Services (except Coin-Operated) |
SIC | 7211: Power Laundries, Family and Commercial |
Sales Range | $10 M to 50M |
# of Employees | 164 |
Plant Area |
44,000
ft2
|
Annual Production | 11,000,000
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $177,600 | 1,348,425 |
kWh
|
$0.13 |
Electricity Demand | $7,664 | 3,121 |
kW-mo/yr
|
$2.46 |
Natural Gas | $300,181 | 22,691 |
MMBtu
|
$13.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $85,427 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,928 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1212: Operate boilers on high fire setting | $10,038 | - | - |
$10,038
-
MMBtu
|
- | - | |
02 | 3.4151: Minimize water usage | $18,580 | $10,000 | - | - |
$8,066
-
Tgal
|
$10,514
-
Tgal
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,452 | $38,199 |
$12,452
99,091
kWh
|
- | - | - | |
04 | 2.1224: Replace boiler | $39,920 | $112,000 | - |
$39,920
-
MMBtu
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,579 | - |
$2,579
20,635
kWh
|
- | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $1,858 | $1,000 | - |
$1,858
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $85,427 | $161,199 |
$15,031
119,726
kWh
|
$51,816
-
MMBtu
|
$8,066
-
Tgal
|
$10,514
-
Tgal
|
||
TOTAL IMPLEMENTED | $42,928 | $49,199 |
$12,452
99,091
kWh
|
$11,896
-
MMBtu
|
$8,066
-
Tgal
|
$10,514
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs