ITAC Assessment: DL0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Monomers, Polyester Acrylates,Sarbox
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $100
M
to 500
M
# of Employees 95
Plant Area 25,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $502,960 9,370,590
kWh
Electricity Demand $214,977 1,286
kW-mo/yr
Natural Gas $1,241,710 127,804
MMBtu
Fuel Oil #2 $578,359 38,502
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $158,914 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $158,914

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $18,300 - $3,000
37,500
kWh
$15,300
-
MMBtu
02 2.7135: Install occupancy sensors $2,396 $285 $2,396
29,952
kWh
-
03 2.2511: Insulate bare equipment $108,300 $104,800 - $108,300
-
MMBtu
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $24,218 $25,000 - $24,218
-
MMBtu
05 2.2614: Use cooling tower or economizer to replace chiller cooling $5,700 $10,000 $5,700
43,575
kWh
-
TOTAL RECOMMENDED $158,914 $140,085 $11,096
111,027
kWh
$147,818
-
MMBtu
TOTAL IMPLEMENTED $158,914 $140,085 $11,096
111,027
kWh
$147,818
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs