ITAC Assessment: CW0127
ITAC logo
ITAC Assessment: CW0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Invetment Castings
NAICS 331512: Steel Investment Foundries
SIC 3324: Steel Investment Foundries
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area 60,000
ft2
Annual Production 2,138,950
lb
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,628 5,758,233
kWh
Electricity Demand $218,043 39,935
kW-mo/yr
Electricity Fees $23,091 -
Natural Gas $142,155 35,628
MMBtu
TOTAL YEARLY COSTS $577,917
RECOMMENDED SAVINGS* $481,723 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $17,576 $56,000 $17,576
520,000
kWh
- - -
02 2.4224: Upgrade controls on compressors $16,199 $33,933 $16,199
479,263
kWh
- - -
03 3.5221: Recycle casting sand $414,227 $38,394 - - - $414,227
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,943 $21,648 $10,598
313,552
kWh
$2,345
-
kW-mo/yr
- -
05 2.8227: Adjust / maintain fork lift trucks for most efficient operation $10,872 $33,000 - - - $10,872
06 2.7491: Insulate glazing, walls, ceilings, and roofs $9,906 $19,900 - - $9,906
-
MMBtu
-
TOTAL RECOMMENDED $481,723 $202,875 $44,373
1,312,815
kWh
$2,345
-
kW-mo/yr
$9,906
-
MMBtu
$425,099
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs