ITAC Assessment: CO0742
ITAC logo
ITAC Assessment: CO0742
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Specialty turbomachinery
NAICS 333996: Fluid Power Pump and Motor Manufacturing
SIC 3594: Fluid Power Pumps and Motors
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 90,000
ft2
Annual Production 1
units
Production Hrs. Annual 5,500
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,764 1,764,194
kWh
Electricity Demand $91,554 5,846
kW-mo/yr
Electricity Fees $16,440 -
Natural Gas $19,561 2,584
MMBtu
TOTAL YEARLY COSTS $222,319
RECOMMENDED SAVINGS* $94,112 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,629

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $83,984 $462,079 $43,845
816,253
kWh
$9,530
-
kW-mo/yr
$30,609
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,833 $2,733 $2,343
43,626
kWh
$1,490
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,478 $359 $1,478
27,515
kWh
- -
04 2.4226: Use / purchase optimum sized compressor $3,318 $16,143 $1,709
31,830
kWh
$1,609
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,499 $200 $374
6,961
kWh
$1,125
-
kW-mo/yr
-
TOTAL RECOMMENDED $94,112 $481,514 $49,749
926,185
kWh
$13,754
-
kW-mo/yr
$30,609
TOTAL IMPLEMENTED $8,629 $19,235 $5,530
102,971
kWh
$3,099
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs