ITAC Assessment: CO0741
ITAC logo
ITAC Assessment: CO0741
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Plastic conduit
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range less than $500
k
# of Employees 69
Plant Area 41,500
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $325,049 9,410,000
kWh
Electricity Demand $365,798 17,993
kW-mo/yr
Electricity Fees $5,869 -
Natural Gas $9,522 1,170
MMBtu
Waste Disposal Costs
Water Usage $1,578 382
Tgal
TOTAL YEARLY COSTS $707,816
RECOMMENDED SAVINGS* $183,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $87,799

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $48,927 $491,439 $33,012
955,734
kWh
$15,915
-
kW-mo/yr
-
02 2.9121: Install wind powered electric generator $38,875 $547,800 $30,126
873,210
kWh
$21,499
-
kW-mo/yr
$(-12,750.0)
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,984 - - $15,984
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $14,264 $21,000 $7,385
214,049
kWh
$6,879
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,303 $3,500 $1,265
36,669
kWh
$1,038
-
kW-mo/yr
-
06 2.4226: Use / purchase optimum sized compressor $3,794 - $2,239
64,896
kWh
$1,555
-
kW-mo/yr
-
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $51,454 $3,624 - $51,454
-
kW-mo/yr
-
08 2.2628: Utilize a less expensive cooling method $7,987 $33,250 $9,020
262,000
kWh
$(-1,033.0)
-
kW-mo/yr
-
TOTAL RECOMMENDED $183,588 $1,100,613 $83,047
2,406,558
kWh
$113,291
-
kW-mo/yr
$(-12,750.0)
TOTAL IMPLEMENTED $87,799 $28,124 $10,889
315,614
kWh
$76,910
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs