| Assessment Year | 2016 |
|---|---|
| Principal Product | Radio Frequency microwave components |
| NAICS | 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 70 |
| Plant Area |
54,019
ft2
|
| Annual Production | 2,000
units
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $62,971 | 1,431,480 |
kWh
|
$0.044 |
| Electricity Demand | $50,153 | 4,095 |
kW-mo/yr
|
$12.25 |
| Electricity Fees | $1,032 | - |
|
- |
| Natural Gas | $11,197 | 1,939 |
MMBtu
|
$5.77 |
| TOTAL YEARLY COSTS | $125,353 | |||
| RECOMMENDED SAVINGS* | $33,300 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $8,470 | $1,300 |
$8,470
175,700
kWh
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,960 | $1,220 |
$3,810
79,100
kWh
|
$1,150
-
kW-mo/yr
|
- | - | |
| 03 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $14,520 | $70,000 |
$12,340
256,100
kWh
|
$2,180
-
kW-mo/yr
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,890 | $16,110 |
$1,960
40,600
kWh
|
$1,920
-
kW-mo/yr
|
$70 | $(-60.0) | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,460 | $4,780 |
$1,120
23,100
kWh
|
$340
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $33,300 | $93,410 |
$27,700
574,600
kWh
|
$5,590
-
kW-mo/yr
|
$70 | $(-60.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs