ITAC Assessment: CO0719
ITAC logo
ITAC Assessment: CO0719
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Electric motors and controllers
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 126,988
ft2
Annual Production 1,100
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,521 1,697,900
kWh
Electricity Demand $84,828 5,255
kW-mo/yr
Electricity Fees $1,584 -
Natural Gas $31,843 3,649
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,280 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,840 $3,490 $1,010
17,500
kWh
$830
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,060 $50,310 $4,600
80,100
kWh
$6,200
-
kW-mo/yr
$170 $(-1,910.0)
03 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $6,380 $48,350 $1,960
34,100
kWh
$4,420
-
kW-mo/yr
- -
TOTAL RECOMMENDED $17,280 $102,150 $7,570
131,700
kWh
$11,450
-
kW-mo/yr
$170 $(-1,910.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs