ITAC Assessment: CO0718
ITAC logo
ITAC Assessment: CO0718
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product MDF Doors
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 154,116
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 6,552
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,761 4,851,104
kWh
Electricity Demand $261,230 13,110
kW-mo/yr
Electricity Fees $3,496 -
Natural Gas $47,946 7,517
MMBtu
LPG $30,261 831
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,270

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,760 $9,430 $2,600
69,300
kWh
$3,160
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,510 $23,940 $6,980
186,100
kWh
$10,690
-
kW-mo/yr
$40 - $(-2,200.0)
03 2.9114: Use solar heat to make electricty $5,670 $31,320 $4,750
45,800
kWh
- - $920 -
04 2.8121: Apply for tax-free status for energy purchases $2,760 $2,500 - - - $2,760 -
05 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $770 $3,450 $150
4,100
kWh
$620
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $30,470 $70,640 $14,480
305,300
kWh
$14,470
-
kW-mo/yr
$40 $3,680 $(-2,200.0)
TOTAL IMPLEMENTED $18,270 $26,440 $6,980
186,100
kWh
$10,690
-
kW-mo/yr
$40 $2,760 $(-2,200.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs