ITAC Assessment: CO0700
ITAC logo
ITAC Assessment: CO0700
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Lighting fixtures
NAICS 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 191,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,243 2,034,900
kWh
Electricity Demand $99,688 4,741
kW-mo/yr
Electricity Fees $606 -
Natural Gas $85,532 12,974
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,900 $1,270 $3,630
81,500
kWh
$3,270
-
kW-mo/yr
- - -
02 2.6218: Turn off equipment when not in use $4,710 - $4,710
105,700
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $16,950 $82,280 $8,230
184,700
kWh
$7,080
-
kW-mo/yr
- $570 $1,070
04 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $4,840 $15,500 $970
21,900
kWh
$3,870
-
kW-mo/yr
- - -
05 2.7243: Improve air circulation with destratification fans / other methods $540 $1,820 $(-340.0)
(-7,600)
kWh
$(-210.0)
-
kW-mo/yr
$1,090
-
MMBtu
- -
TOTAL RECOMMENDED $33,940 $100,870 $17,200
386,200
kWh
$14,010
-
kW-mo/yr
$1,090
-
MMBtu
$570 $1,070
TOTAL IMPLEMENTED $6,900 $1,270 $3,630
81,500
kWh
$3,270
-
kW-mo/yr
- - -