ITAC Assessment: CO0698
ITAC logo
ITAC Assessment: CO0698
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Airfoil restoration
NAICS 336411: Aircraft Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 53
Plant Area 96,100
ft2
Annual Production 420
pieces
Production Hrs. Annual 3,393
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,996 1,029,790
kWh
Electricity Demand $74,681 4,145
kW-mo/yr
Electricity Fees $4,525 -
Natural Gas $49,955 6,950
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,320 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,370

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $4,950 $300 $1,250
29,800
kWh
$3,700
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,570 $500 $550
13,100
kWh
$1,020
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,800 $16,900 $2,250
53,400
kWh
$4,090
-
kW-mo/yr
$100 - $360
04 2.8121: Apply for tax-free status for energy purchases $6,000 $1,500 - - - $6,000 -
TOTAL RECOMMENDED $19,320 $19,200 $4,050
96,300
kWh
$8,810
-
kW-mo/yr
$100 $6,000 $360
TOTAL IMPLEMENTED $8,370 $17,400 $2,800
66,500
kWh
$5,110
-
kW-mo/yr
$100 - $360
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs