Assessment Year | 2014 |
---|---|
Principal Product | Orthopaedic and Surgical Instruments |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
15,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $69,675 | 1,552,560 |
kWh
|
$0.045 |
Electricity Demand | $73,322 | 3,362 |
kW-mo/yr
|
$21.81 |
Electricity Fees | $636 | - |
|
- |
Natural Gas | $1,893 | 216 |
MMBtu
|
$8.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,550 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,100 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $4,160 | $8,890 |
$2,550
53,200
kWh
|
$1,610
-
kW-mo/yr
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $3,170 | $6,690 |
$1,050
22,000
kWh
|
$2,120
-
kW-mo/yr
|
- | - | |
03 | 2.7241: Install outside air damper / economizer on hvac unit | $6,690 | - |
$3,840
80,200
kWh
|
$2,850
-
kW-mo/yr
|
- | - | |
04 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $6,330 | $27,820 |
$2,000
41,700
kWh
|
$4,330
-
kW-mo/yr
|
- | - | |
05 | 2.8121: Apply for tax-free status for energy purchases | $6,080 | $1,500 | - | - | - | $6,080 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,120 | $4,630 |
$580
12,200
kWh
|
$520
-
kW-mo/yr
|
$20 | - | |
TOTAL RECOMMENDED | $27,550 | $49,530 |
$10,020
209,300
kWh
|
$11,430
-
kW-mo/yr
|
$20 | $6,080 | ||
TOTAL IMPLEMENTED | $19,100 | $29,320 |
$5,840
121,900
kWh
|
$7,180
-
kW-mo/yr
|
- | $6,080 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs