ITAC Assessment: CO0684
ITAC logo
ITAC Assessment: CO0684
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Food Products
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 81,800
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 7,300
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,991 3,110,080
kWh
Electricity Demand $135,578 6,412
kW-mo/yr
Electricity Fees $1,224 -
Natural Gas $59,541 9,223
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,790

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,830 $3,600 $3,420
76,700
kWh
- $(-1,590.0)
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $920 $2,600 $2,550
57,300
kWh
- $(-1,630.0)
-
MMBtu
-
03 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $28,690 $96,370 $12,790
287,000
kWh
$15,900
-
kW-mo/yr
- -
04 2.8121: Apply for tax-free status for energy purchases $9,790 $1,500 - - - $9,790
TOTAL RECOMMENDED $41,230 $104,070 $18,760
421,000
kWh
$15,900
-
kW-mo/yr
$(-3,220.0)
-
MMBtu
$9,790
TOTAL IMPLEMENTED $9,790 $1,500 - - - $9,790
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs