Assessment Year | 1988 |
---|---|
Principal Product | TELEPHONE DIRECTORIES |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $50 M to 100M |
# of Employees | 203 |
Plant Area |
n/a
|
Annual Production | 70,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $287,207 | 5,322,099 |
kWh
|
$0.054 |
Natural Gas | $32,263 | 6,875 |
MMBtu
|
$4.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,432 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,499 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $604 | - |
$604
11,137
kWh
|
- | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,024 | - |
$2,024
37,515
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,286 | $749 |
$3,362
62,427
kWh
|
- | $(-76.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $623 | $623 |
$704
12,896
kWh
|
- | $(-81.0) | |
05 | 2.2511: Insulate bare equipment | $342 | $396 |
$342
6,448
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $545 | $689 |
$448
8,206
kWh
|
- | $97 | |
07 | 2.4133: Use most efficient type of electric motors | $201 | $260 |
$201
3,810
kWh
|
- | - | |
08 | 2.3212: Optimize plant power factor | $1,092 | $2,730 |
$1,092
-
kWh
|
- | - | |
09 | 2.2437: Recover waste heat from equipment | $3,684 | $7,740 | - |
$3,684
-
MMBtu
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31 | $135 |
$31
586
kWh
|
- | - | |
TOTAL RECOMMENDED | $12,432 | $13,322 |
$8,808
143,025
kWh
|
$3,684
-
MMBtu
|
$(-60.0) | ||
TOTAL IMPLEMENTED | $6,499 | $11,950 |
$2,718
30,187
kWh
|
$3,684
-
MMBtu
|
$97 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs