Assessment Year | 2014 |
---|---|
Principal Product | Injection molded metal parts |
NAICS | 332117: Powder Metallurgy Part Manufacturing |
SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
105,000
ft2
|
Annual Production | 7,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $527,580 | 9,377,777 |
kWh
|
$0.056 |
Electricity Demand | $373,794 | 21,160 |
kW-mo/yr
|
$17.67 |
Electricity Fees | $795 | - |
|
- |
Natural Gas | $37,169 | 5,513 |
MMBtu
|
$6.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $189,960 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $175,400 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,480 | $13,140 |
$3,710
62,700
kWh
|
$3,770
-
kW-mo/yr
|
- | - | |
02 | 2.2511: Insulate bare equipment | $3,470 | $900 |
$2,510
42,400
kWh
|
$960
-
kW-mo/yr
|
- | - | |
03 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $175,400 | $229,810 |
$132,870
2,244,300
kWh
|
$38,700
-
kW-mo/yr
|
$3,830
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,610 | $8,490 |
$2,430
41,000
kWh
|
$1,130
-
kW-mo/yr
|
- | $50 | |
TOTAL RECOMMENDED | $189,960 | $252,340 |
$141,520
2,390,400
kWh
|
$44,560
-
kW-mo/yr
|
$3,830
-
MMBtu
|
$50 | ||
TOTAL IMPLEMENTED | $175,400 | $229,810 |
$132,870
2,244,300
kWh
|
$38,700
-
kW-mo/yr
|
$3,830
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs