ITAC Assessment: CO0681
ITAC logo
ITAC Assessment: CO0681
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Injection molded metal parts
NAICS 332117: Powder Metallurgy Part Manufacturing
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 105,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $527,580 9,377,777
kWh
Electricity Demand $373,794 21,160
kW-mo/yr
Electricity Fees $795 -
Natural Gas $37,169 5,513
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $189,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $175,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,480 $13,140 $3,710
62,700
kWh
$3,770
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $3,470 $900 $2,510
42,400
kWh
$960
-
kW-mo/yr
- -
03 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $175,400 $229,810 $132,870
2,244,300
kWh
$38,700
-
kW-mo/yr
$3,830
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,610 $8,490 $2,430
41,000
kWh
$1,130
-
kW-mo/yr
- $50
TOTAL RECOMMENDED $189,960 $252,340 $141,520
2,390,400
kWh
$44,560
-
kW-mo/yr
$3,830
-
MMBtu
$50
TOTAL IMPLEMENTED $175,400 $229,810 $132,870
2,244,300
kWh
$38,700
-
kW-mo/yr
$3,830
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs