ITAC Assessment: CO0674
ITAC logo
ITAC Assessment: CO0674
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Computer display kiosks
NAICS 334118: Computer Terminal and Other Computer Peripheral Equipment Manufacturing
SIC 3577: Computer Peripheral Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 104,250
ft2
Annual Production 9,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,762 1,682,429
kWh
Electricity Demand $92,046 4,344
kW-mo/yr
Electricity Fees $1,827 -
Natural Gas $37,322 5,987
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,670 $310 $1,410
33,800
kWh
$1,260
-
kW-mo/yr
- - -
02 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $4,510 $13,600 $1,440
34,500
kWh
$3,070
-
kW-mo/yr
- - -
03 2.7229: Air condition only space necessary $3,740 - $1,070
25,700
kWh
$2,670
-
kW-mo/yr
- - -
04 2.8121: Apply for tax-free status for energy purchases $4,320 $500 - - - $4,320 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,830 $250 $550
13,200
kWh
$1,180
-
kW-mo/yr
$120 - $(-20.0)
TOTAL RECOMMENDED $17,070 $14,660 $4,470
107,200
kWh
$8,180
-
kW-mo/yr
$120 $4,320 $(-20.0)
TOTAL IMPLEMENTED $4,500 $560 $1,960
47,000
kWh
$2,440
-
kW-mo/yr
$120 - $(-20.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs