| Assessment Year | 2012 |
|---|---|
| Principal Product | Ready Mix Concrete |
| NAICS | 327320: Ready-Mix Concrete Manufacturing |
| SIC | 3273: Ready-Mixed Concrete |
| Sales Range | $1 M to 5M |
| # of Employees | 16 |
| Plant Area |
5,400
ft2
|
| Annual Production | 80,000
pieces
|
| Production Hrs. Annual | 3,432
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $13,699 | 358,000 |
kWh
|
$0.038 |
| Electricity Demand | $34,311 | 1,698 |
kW-mo/yr
|
$20.21 |
| Electricity Fees | $587 | - |
|
- |
| LPG | $25,518 | 1,602 |
MMBtu
|
$15.93 |
| Fuel Oil #2 | $39,667 | 1,851 |
MMBtu
|
$21.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,650 | $17,010 |
$660
17,100
kWh
|
$1,990
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,280 | $1,600 |
$790
20,400
kWh
|
$1,490
-
kW-mo/yr
|
- | |
| 03 | 2.8121: Apply for tax-free status for energy purchases | $1,310 | $500 | - | - | $1,310 | |
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $1,790 | $1,800 |
$710
18,400
kWh
|
$1,080
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $720 | $2,840 |
$250
6,500
kWh
|
$470
-
kW-mo/yr
|
- | |
| 06 | 2.9114: Use solar heat to make electricty | $2,620 | $32,500 |
$550
14,100
kWh
|
$940
-
kW-mo/yr
|
$1,130 | |
| TOTAL RECOMMENDED | $11,370 | $56,250 |
$2,960
76,500
kWh
|
$5,970
-
kW-mo/yr
|
$2,440 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs