Assessment Year | 2012 |
---|---|
Principal Product | Ready Mix Concrete |
NAICS | 327320: Ready-Mix Concrete Manufacturing |
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $1 M to 5M |
# of Employees | 16 |
Plant Area |
5,400
ft2
|
Annual Production | 80,000
pieces
|
Production Hrs. Annual | 3,432
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $13,699 | 358,000 |
kWh
|
$0.038 |
Electricity Demand | $34,311 | 1,698 |
kW-mo/yr
|
$20.21 |
Electricity Fees | $587 | - |
|
- |
LPG | $25,518 | 1,602 |
MMBtu
|
$15.93 |
Fuel Oil #2 | $39,667 | 1,851 |
MMBtu
|
$21.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,650 | $17,010 |
$660
17,100
kWh
|
$1,990
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,280 | $1,600 |
$790
20,400
kWh
|
$1,490
-
kW-mo/yr
|
- | |
03 | 2.8121: Apply for tax-free status for energy purchases | $1,310 | $500 | - | - | $1,310 | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $1,790 | $1,800 |
$710
18,400
kWh
|
$1,080
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $720 | $2,840 |
$250
6,500
kWh
|
$470
-
kW-mo/yr
|
- | |
06 | 2.9114: Use solar heat to make electricty | $2,620 | $32,500 |
$550
14,100
kWh
|
$940
-
kW-mo/yr
|
$1,130 | |
TOTAL RECOMMENDED | $11,370 | $56,250 |
$2,960
76,500
kWh
|
$5,970
-
kW-mo/yr
|
$2,440 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs