ITAC Assessment: CO0654
ITAC logo
ITAC Assessment: CO0654
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Prestressed concrete panels
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 10,000
ft2
Annual Production 45,600
pieces
Production Hrs. Annual 5,766
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,787 1,547,326
kWh
Electricity Demand $84,222 4,766
kW-mo/yr
Electricity Fees $4,461 -
Natural Gas $197,378 39,059
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2135: Repair and eliminate steam leaks $8,050 $1,440 - - $8,050
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,130 $1,990 $1,310
39,100
kWh
$820
-
kW-mo/yr
- - -
03 2.4239: Eliminate or reduce compressed air usage $570 $820 $210
6,200
kWh
$360
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,900 $17,990 $3,080
92,300
kWh
$3,580
-
kW-mo/yr
- $150 $90
TOTAL RECOMMENDED $17,650 $22,240 $4,600
137,600
kWh
$4,760
-
kW-mo/yr
$8,050
-
MMBtu
$150 $90
TOTAL IMPLEMENTED $17,650 $22,240 $4,600
137,600
kWh
$4,760
-
kW-mo/yr
$8,050
-
MMBtu
$150 $90
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs