Assessment Year | 2010 |
---|---|
Principal Product | Aerospace manufacturing |
NAICS | 336411: Aircraft Manufacturing |
SIC | 3721: Aircraft |
Sales Range | $100 M to 500M |
# of Employees | 243 |
Plant Area |
170,770
ft2
|
Annual Production | 400
pieces
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $216,158 | 5,539,651 |
kWh
|
$0.039 |
Electricity Demand | $220,877 | 11,852 |
kW-mo/yr
|
$18.64 |
Electricity Fees | $440 | - |
|
- |
Natural Gas | $142,746 | 23,120 |
MMBtu
|
$6.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,440 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,520 | $1,000 |
$2,640
57,500
kWh
|
$1,880
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,750 | $1,000 | - | - | - | - | $14,750 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,030 | $35,000 |
$4,990
108,900
kWh
|
$3,040
-
kW-mo/yr
|
- | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,750 | $15,000 |
$2,950
64,400
kWh
|
$1,800
-
kW-mo/yr
|
- | - | - | |
05 | 2.9114: Use solar heat to make electricty | $2,500 | $27,500 |
$660
14,500
kWh
|
$1,260
-
kW-mo/yr
|
- | $580 | - | |
06 | 2.7314: Reduce ventilation air | $1,390 | $12,400 |
$670
14,700
kWh
|
$690
-
kW-mo/yr
|
$20 | $10 | - | |
TOTAL RECOMMENDED | $35,940 | $91,900 |
$11,910
260,000
kWh
|
$8,670
-
kW-mo/yr
|
$20 | $590 | $14,750 | ||
TOTAL IMPLEMENTED | $33,440 | $64,400 |
$11,250
245,500
kWh
|
$7,410
-
kW-mo/yr
|
$20 | $10 | $14,750 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs