| Assessment Year | 2010 |
|---|---|
| Principal Product | Commercial Lithographic Printing |
| NAICS | 323111: Commercial Printing (except Screen and Books) |
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $5 M to 10M |
| # of Employees | 67 |
| Plant Area |
80,000
ft2
|
| Annual Production | 80,049,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $26,662 | 714,720 |
kWh
|
$0.037 |
| Electricity Demand | $41,091 | 2,331 |
kW-mo/yr
|
$17.63 |
| Electricity Fees | $780 | - |
|
- |
| Natural Gas | $36,565 | 5,786 |
MMBtu
|
$6.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,410 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,960 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,960 | $18,470 |
$4,570
120,400
kWh
|
$5,020
-
kW-mo/yr
|
- | $150 | $220 | |
| 02 | 2.7243: Improve air circulation with destratification fans / other methods | $6,290 | $21,810 |
$(-570.0)
(-15,000)
kWh
|
$(-410.0)
-
kW-mo/yr
|
$7,270
-
MMBtu
|
- | - | |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,870 | $1,220 | - | - |
$1,870
-
MMBtu
|
- | - | |
| 04 | 2.9114: Use solar heat to make electricty | $1,760 | $10,500 |
$550
14,600
kWh
|
$1,210
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $530 | $2,030 |
$70
1,900
kWh
|
$60
-
kW-mo/yr
|
- | $150 | $250 | |
| TOTAL RECOMMENDED | $20,410 | $54,030 |
$4,620
121,900
kWh
|
$5,880
-
kW-mo/yr
|
$9,140
-
MMBtu
|
$300 | $470 | ||
| TOTAL IMPLEMENTED | $9,960 | $18,470 |
$4,570
120,400
kWh
|
$5,020
-
kW-mo/yr
|
- | $150 | $220 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs