ITAC Assessment: CO0632
ITAC logo
ITAC Assessment: CO0632
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Commercial Lithographic Printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 67
Plant Area 80,000
ft2
Annual Production 80,049,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,662 714,720
kWh
Electricity Demand $41,091 2,331
kW-mo/yr
Electricity Fees $780 -
Natural Gas $36,565 5,786
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,410 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,960

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,960 $18,470 $4,570
120,400
kWh
$5,020
-
kW-mo/yr
- $150 $220
02 2.7243: Improve air circulation with destratification fans / other methods $6,290 $21,810 $(-570.0)
(-15,000)
kWh
$(-410.0)
-
kW-mo/yr
$7,270
-
MMBtu
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,870 $1,220 - - $1,870
-
MMBtu
- -
04 2.9114: Use solar heat to make electricty $1,760 $10,500 $550
14,600
kWh
$1,210
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $530 $2,030 $70
1,900
kWh
$60
-
kW-mo/yr
- $150 $250
TOTAL RECOMMENDED $20,410 $54,030 $4,620
121,900
kWh
$5,880
-
kW-mo/yr
$9,140
-
MMBtu
$300 $470
TOTAL IMPLEMENTED $9,960 $18,470 $4,570
120,400
kWh
$5,020
-
kW-mo/yr
- $150 $220
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs