ITAC Assessment: CO0622
ITAC logo
ITAC Assessment: CO0622
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Doors
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 36,000
ft2
Annual Production 173,000
pieces
Production Hrs. Annual 6,552
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,594 3,092,160
kWh
Electricity Demand $79,112 5,191
kW-mo/yr
Electricity Fees $341 -
Natural Gas $22,611 2,666
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,470 $10,470 $5,670
153,600
kWh
$4,800
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,540 $1,000 $4,160
112,600
kWh
$3,380
-
kW-mo/yr
03 2.4239: Eliminate or reduce compressed air usage $5,500 $110 $3,660
99,300
kWh
$1,840
-
kW-mo/yr
04 2.4224: Upgrade controls on compressors $1,640 $70 $650
17,600
kWh
$990
-
kW-mo/yr
TOTAL RECOMMENDED $25,150 $11,650 $14,140
383,100
kWh
$11,010
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs