ITAC Assessment: CO0608
ITAC logo
ITAC Assessment: CO0608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Prime mover controls
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 3625: Relays and Industrial Controls
Sales Range $50
M
to 100
M
# of Employees 1,000
Plant Area 223,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,744
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $283,225 15,625,400
kWh
Electricity Demand $417,648 53,228
kW-mo/yr
Electricity Fees $384 -
Natural Gas $200,926 23,908
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4224: Upgrade controls on compressors $11,650 $56,600 $5,190
278,300
kWh
$6,460
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,530 $1,500 $2,060
110,500
kWh
$2,470
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,470 $60 $1,780
95,300
kWh
$1,690
-
kW-mo/yr
-
04 2.1224: Replace boiler $23,660 $20,000 $1,890
101,300
kWh
$2,230
-
kW-mo/yr
$19,540
-
MMBtu
05 2.7135: Install occupancy sensors $340 $1,370 $280
14,800
kWh
$60
-
kW-mo/yr
-
TOTAL RECOMMENDED $43,650 $79,530 $11,200
600,200
kWh
$12,910
-
kW-mo/yr
$19,540
-
MMBtu
TOTAL IMPLEMENTED $43,650 $79,530 $11,200
600,200
kWh
$12,910
-
kW-mo/yr
$19,540
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs